Araştırma Projeleri (Referans Listesinden Alıntı)

Bitiş Yılı

Konu Başlıkları

Proje Süresi

Ülke

 

 

 

 

2013

HYPROWIND – Realistic Scenarios for Underwater Noise on the Basis of Prognosis Models and Monitoring for the Construction of Offshore Wind Farms in the German North Sea

3 Years

DE (with partners)

2013

RAVE – Coordination of Measurements

3 Years

DE (with partners)

2011

RAVE – OWEA – Verification of Offshore WT

3 Years

DE (with partners)

2011

FINO – Technical Measurements on the FINO1 – Research Platform

over 5 Years

DE (with partners)

2010

RAVE - LIDAR – Qualification for Power Performance Measurements

3 Years

DE (with partners)

2010

RAVE – Service Project – Technical Measurements at alpha ventus

4 Years

DE (with partners)

2010

Conception and Verification of Noise Reduction Procedures During the Installation of Offshore WEC’s

3 Years

DE (with partners)

2008

OWID - Offshore Wind Design Parameter

3 Years

DE

2007

FINO – Technical Measurements on the FINO1 – Research Platform

over 5 Years

DE

2006

ACCUWIND - Accurate wind speed Measurements in Wind Energy

3 Years

NL, DK, GR, GE, ES

2006

Standard Procedures for the Determination and Assessment of Noise Impact on Sea Life by Offshore Wind Farms

over 4 Years

DE

2004

WISE - Wind Energy Sodar Evaluation, EU research project

over 2,5 Years

NL, DK, GR, GE, ES

2004

OPTIMAT Blades - Reliable Optimal Use of Materials for Wind Turbine Rotor Blades

over 2 Years

B, DE, DK, ES, FIN, NL, UK

2004

FIRMWIND -Towards High Penetration and Firm Power from Wind Energy

over 2 Years

DE, S, UK

2003

Investigation of the impact of the wake effect of wind turbines on the stability of the neighbouring WEC in wind farms

over 1 Year

DE

2003

Acoustic noise immissions from offshore wind farms. Part of UBA Project FKZ 200 97 106

2 Years

DE

2002

Concerted Action Off-shore

2 Years

13 EU Countries

2002

Towards High Penetration and Firm Power from Wind Energy

2 Years

DE, NO, UK

2002

Tauern Windpark Oberzeiring - Wind Energy at Alpine Site With Severe Weather Conditions

3 Years

AT, DE, DK, FI

2001

German-Polish Cross-Border Opet

1 Year

DE, PL

2001

Identification of Variables for Site Calibration and Power Curve Assessment in Complex Terrain

2,5 Years

DE, DK, GR, NL, UK

2001

3-D Motion Analysis in Full Scale Wind Turbines

3 Years

DE, DK, NL

2000

Declaration of Sound Power Level and Tonality for Wind Turbine Generator Systems, Concerted Action

1,5 Years

DE, DK, NL, SE, UK

2000

Development of a Standardised Cup Anemometer Suited to Wind Energy Application

2 Years

DE, DK, S

2000

Performance Evaluation Methods for Autonomous, Application Oriented Wind Turbines

over 2 Years

DE, DK, NL, UK

2000

Integration of Wind Turbines into the Electricity Supply Networks

2 Years

DE, GR, PT

2000

Development of Structured Courses & Supporting Material for the Training of Engineers and Technicians in the Field of Wind Energy

3 Years

DE, GR, IT

2000

Bio-blade: Development of a Rotor Blade Using Renewable Materials

over 2 Years

DE, NL